excavated rock and leed

  • Excavated Rock And Leed

    Excavated Rock And Leed Debut of the West Wing Smith Magazine The use of high energy-efficiency components (windows, HVAC, light fixtures) and environmentally friendly materials such as Forest Stewardship Council certified wood products, and the recycling of excavated rock and soil, ticked other LEED check-boxes.

  • Excavated Soil LEEDuser

    Jul 08, 2010· According to guidebook 'Excavated soil and land-clearing debris do not contribute to this credut', does it mean soil is not counted as construction waste, or non-recyclable waste (but still counted in the denominator as total quantity of waste)? If the waste generated in the foundation stage is mainly rock and soil, and the description in the receipt issued by public fill is

  • Procedure for Excavation in Rocks The Constructor

    Nov 07, 2014· Many times excavation in rocks are required for foundation of structure. The procedure for excavation in rocks is different than excavation in ordinary soils. It requires skilled manpower and specialized tools and equipments for excavating the rocky ground. Procedure for Excavation in Rocks Excavation in rock requiring drilling and blasting shall be done under coordination

  • Karuna House excavation: the Passive House, Minergie, LEED

    Oct 07, 2011· Karuna House excavation: the Passive House, Minergie, LEED Platinum project is underway. October 7, 2011 By Zack Semke. Site photos offer a glimpse of the project’s green building design and construction strategies. Construction on the Karuna House is underway! As I blogged recently, the project is a national green building case study based

  • Excavation Rock an overview ScienceDirect Topics

    For any construction projects, soil or rock excavation is required (1) to understand the ground profile and soil/rock stratification, (2) to collect samples for laboratory tests, (3) to facilitate various field tests at different depths, (4) to understand the groundwater conditions, and (5) to identify if any subsurface anomalies or utilities are present below the ground surface.

  • Work commences for Snowy 2

    The rock excavated during tunnelling will be carefully managed and reused wherever possible, including at the portal and in road construction and upgrades. Excavated rock that is not suitable Leed also has an excellent reputation for delivering projects on time and working collaboratively with clients, stakeholders and the wider community.

  • Gold LEED Certification Rockwool

    LEED ® certification distinguishes building projects that have demonstrated a commitment to sustainability by meeting the highest performance standards for design, construction and operation.” LEED ® Gold ® certification is the second highest attainable level, reflecting best-in-class green building strategies, practices and materials. It

  • Recycled Pavement?

    Recycled Pavement? Dykes recycling services give old and waste construction material new life in new construction and rehabilitation projects. If your building plans include demolition as well as new construction, we can help you save money, reduce or even eliminate waste and achieve LEED credits for sustainable development.

  • NC-2009 MRc2: Construction Waste Management LEEDuser

    LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time. Excavated soil and land-clearing debris do not contribute to this credit

  • 31 20 10 Earthwork General Requirements

    .1 The following classifications of excavation will be made when solid rock, rock in ledges, rock hard cementitious aggregate deposits, large boulders or other similar obstructions are encountered:.1 Earth Excavation..2 Rock Excavation in Trenches and Pits..3 Rock Excavation in Open Excavations. .2 "Earth Excavation" includes:

  • Achieving LEED Gold Design in Higher Ed and on a Budget

    The entire building site was formerly covered by a parking lot, and the new site plan maximized the open green area surrounding the building footprint. “Slab-on-grade foundation design eliminated the need for extensive and costly rock excavation that is typical for construction projects in the Catskill Mountains region,” Sengupta says.

  • Services Weitman Excavation Excavating & Construction

    Rock falls and slides. Weitman Excavation is a certified contractor in LEED and sustainability business practices which maximize our value to our clients and reduce the impact on the environment in which we work. By being part of the integrated project delivery and design teams, our team members contribute to innovation which supports the

  • HCD Mag

    Apr 30, 2007· As LEED has evolved, these three elements are being more fully embraced. If it is determined through geotechnical studies that rock exists under the site and some removal is going to be required, there are a number of options to the wholesale haul-off of the blasted or excavated material. Limestone or similar rock can be crushed on-site and

  • LEED Chapter 6 Flashcards

    12 Rock: Term. For LEED, what C&D Debris are not counted towards construction waste management calculations? And why? Definition. Excavated soil Dirt Rock Hazardous waste Because doing so skews the percentage of waster diverted since these materials can

  • Home Building Timeline: How Long Does It Take? SDL

    Week 1: Excavation and Leveling. For many new homeowners, the first week is one of the most exciting weeks of the building process. This week, we’ll break ground on your new home. Most of the excavation and leveling is done. You’ll see bulldozers and compactors on your lot this week. If your new home has a basement, we’ll begin excavating it.

  • Slab-on-Grade Foundation Detail & Insulation, Building Guide

    Jan 06, 2014· Slab on Grade foundation, detail design; the basics. There are many different soil conditions and corresponding slab designs. This page is about how to build a thickened edge concrete slab on grade FPSF footing on soil with a high water table to prevent frost heave, by first installing drainage below the slab. Related slab on grade foundation pages:

  • Wells Fargo Announces LEED® Platinum Certification for

    350,000 cubic yards of rock from the site were excavated, crushed, and reused for the construction of 4 miles of new highway. Earning LEED certification is one of the ways Wells Fargo

  • 31 20 10 Earthwork General Requirements

    .1 The following classifications of excavation will be made when solid rock, rock in ledges, rock hard cementitious aggregate deposits, large boulders or other similar obstructions are encountered:.1 Earth Excavation..2 Rock Excavation in Trenches and Pits..3 Rock Excavation in Open Excavations. .2 "Earth Excavation" includes:

  • About Us Goldin and Stafford Leader in Excavation

    2008 & 2009 outstanding safe work practices in excavation hcca saftey committee. 2009, 2010, 2011 sitework subcontractor of the year abc. 2012 above & beyond service award bozzuto group. 2015 most reliable subcontractor bozzuto group. 2016 sitework subcontractor of the year abc. 2018 subcontractor of the year asa

  • BOQ for Building works Engineering Projects

    1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed within a lead of 50m 6.1 2.9.1 Ordinary rock Cum 798.06 165.00 Rupees One Hundred Sixty Five Only 131679.90 6.2 2.9.2 Hard rock (requiring blasting) Cum 145.11 295.60 Rupees Two Hundred Ninety Five and Paise Sixty Only 42894.52

  • Between a Rock and a Hardscape Custom Home Magazine

    Sep 29, 2010· Between a Rock and a Hardscape LEED AP. Between a Rock and a Hardscape View All 9 Photos Play slideshow . curved walls that extend into the landscape. The cement block walls, mixed with crushed stone excavated from the site and sandblasted, are both practical and poetic. They step the building into the slope, which was necessary to meet

  • The Pierre Olson Kundig American-Architects

    Excavated rock was re-used as crushed aggregate in the concrete flooring. Excavation marks were left exposed on all the stonework, a reminder of the building process. With the exception of a separate guest suite, the Pierre functions on one main level, with an open plan kitchen, dining and living space.

  • LEED Prefab Kit Homes in Vancouver Ecohome

    May 11, 2012· Here is a link to our page on LEED and Passive House ready prefab kit houses, these are available in your area.. The LEED Platinum Kenogami house is an exceptional build and was our first demo house, but that and our second one (the Edelweiss House) are both site builds, but our more recent one (the Wakefield House) is a kit home, and we placed it on a solar air heated slab as well, so if you

  • Recycle Your Roadways with Full Depth

    Learning Objectives 1) Recognize the environmental, economic, and social benefits of recycling road base materials. 2) Compare FDR as a design alternative to traditional excavation and rock base construction. 3) Plan and implement reclamation projects using the FDR process. Video..

  • Achieving LEED Gold Design in Higher Ed and on a Budget

    The entire building site was formerly covered by a parking lot, and the new site plan maximized the open green area surrounding the building footprint. “Slab-on-grade foundation design eliminated the need for extensive and costly rock excavation that is typical for construction projects in the Catskill Mountains region,” Sengupta says.

  • Rock Excavation and Crushing Liesfeld, Contractor Inc.

    Liesfeld also provides clients traditional rock excavation including drilling/blasting, hydraulic rammming, and excavation. Rock Crushing Liesfeld uses track mounted mobile crushers and can deploy multiple crushing operations on a single project. Crushed material can be produced into 6″ to 12″ fill material or screened to meet specific job

  • First LEED Gold Project for the Federal Bureau of Prisons

    Rock excavated from the site was crushed and re-used as backfill material, eliminating the need to bring in stone that was remotely quarried. FCI at Hazelton marks the 50 th LEED certified

  • Building Contractors JKar Construction

    JKar, Inc., building contractors, is a full service, fully equipped turn key construction company based in Guleph, Ontario. JKar, Inc. owns its own fleet of trucks and excavation equipment. Our experience has come to include projects of many different sizes, from small tenant improvement projects to large corporate headquarters, and we have gained experience in most major market segments

  • North Carolina county opens C&D recycling facility to

    Apr 07, 2017· Rock and Recycling Equipment provides new and used equipment for rental and sale including a full range of parts for all equipment. It will work closely with MWS to understand its customer needs and incorporate a range of services such as after sales technical service support, spare parts requirements and product warranty.

  • The Pierre Olson Kundig American-Architects

    Excavated rock was re-used as crushed aggregate in the concrete flooring. Excavation marks were left exposed on all the stonework, a reminder of the building process. With the exception of a separate guest suite, the Pierre functions on one main level, with an open plan kitchen, dining and living space.

  • Recycle Your Roadways with Full Depth

    Learning Objectives 1) Recognize the environmental, economic, and social benefits of recycling road base materials. 2) Compare FDR as a design alternative to traditional excavation and rock base construction. 3) Plan and implement reclamation projects using the FDR process. Video..

  • GOLDIN & STAFFORD, INC. LinkedIn

    GOLDIN & STAFFORD, INC. 336 followers on LinkedIn Trusted in DC, MD, and VA for Excavation, Site Preparation, and Demolition for over 28 years Goldin & Stafford was formed in 1992 by Ralph

  • Best 30 Fill Dirt in Irving, TX with Reviews YP

    Fill Dirt in Irving on YP. See reviews, photos, directions, phone numbers and more for the best Topsoil in Irving, TX.

  • Home Building Timeline: How Long Does It Take? SDL

    Week 1: Excavation and Leveling. For many new homeowners, the first week is one of the most exciting weeks of the building process. This week, we’ll break ground on your new home. Most of the excavation and leveling is done. You’ll see bulldozers and compactors on your lot this week. If your new home has a basement, we’ll begin excavating it.

  • University of California classroom and office building

    Mar 30, 2017· Ten years after receiving its first Leadership in Energy and Environmental Design (LEED) certification from the U.S. Green Building Council (USGBC), the University of California (UC), Merced in Merced, California, has earned platinum certification for Classroom and Office Building 2 (COB2). This marks the campus’ 17th LEED certification for new construction and its eighth platinum designation.

  • DDC SAMPLE C&D WASTE MANAGEMENT PLAN June 2003

    Excavated Rock Reuse on site as fill Collect for crushing by Inert Inc. Cardboard packaging Recycle: Tri-State Paper Collect on each floor for bundling Steel/Metals Recycle: NY Metals Deposit in metals container Mixed C&D waste 4 tons recycled 6 tons landfill 40% Sort/Disposal: Waste Corp. Deposit in general dumpster

  • The Pierre Olson Kundig Arch2O

    To set the house deep into the site, portions of the rock outcropping were excavated through machine work and handwork. The contractor used large drills to set the outline of the building, then used dynamite, hydraulic chippers, a selection of wire saws and other hand tools, working with finer and finer implements as construction progressed.

  • Wells Fargo Announces LEED® Platinum Certification for

    350,000 cubic yards of rock from the site were excavated, crushed, and reused for the construction of 4 miles of new highway. Earning LEED certification is one of the ways Wells Fargo